Skip to main content

Thyssenkrupp Levant Stair Lift Installation Manual Full !free! 【WORKING »】

Shims (provided in plastic bag #4) are mandatory when the stair stringer is not plumb. Never force a bracket to bend—shim gaps exceeding 5mm require a carpenter’s level consultation.

: Install the charging contact strip along the rail and connect the transformer to a standard 220V/110V wall socket . thyssenkrupp levant stair lift installation manual full

Ensure the "on/off" switch on the chassis is in the OFF position. Shims (provided in plastic bag #4) are mandatory

Use a spirit level to ensure the rail is consistent. thyssenkrupp levant stair lift installation manual full

A complete OEM manual for the ThyssenKrupp Levant is typically 60–80 pages long and divided into six core sections:

The Levant uses a dry-rail system. Do not apply grease to the rail; instead, keep it clean and free of dust.